Large-Scale Moving Projects in Montreal

Multi-phase, multi-floor and multi-site relocations for warehouses, institutions, schools, clinics and corporate campuses — planned and managed as one project.

Fixed or hourly Fixed or hourly, set after planning

Get my price +1 (514) 885-9901

Long-distance truck loaded with a mattress and secured furniture, doors open

When a move becomes a project

Most moves happen in a day. Some cannot: a warehouse with thousands of items, a hospital department that must keep seeing patients, a school that moves over the summer, a company consolidating three sites into one, an office tower moving floor by floor. These are large-scale moving projects, and they are won or lost in the planning — long before the first truck arrives.

We plan and run large moves as projects, with a dedicated project manager, a written plan with phases and milestones, and a written scope and quote. The same crews that move homes and offices every day do the work; the difference is the structure around them.

Types of large-scale projects

Warehouses and distribution centres

Palletized stock, racking contents, packing stations, workshop equipment and offices. We inventory, move and place goods so the warehouse can resume shipping quickly, working with your forklift operators and, where racking has to be dismantled and reinstalled, with a racking installer.

Institutions and public buildings

Schools, colleges, libraries, municipal and government offices. These projects usually happen during closures, follow procurement and security rules, and involve many stakeholders. We are used to working with facilities managers, security staff and building rules that differ from one wing to the next.

Healthcare facilities

Clinics, medical offices and laboratories, where patient records must stay confidential and equipment may need recalibration. Records travel in sealed, numbered containers; sensitive equipment is prepared by your technicians and moved on their schedule.

Multi-floor and multi-site offices

Companies moving several floors, or consolidating several locations into one. Each floor or site becomes a phase with its own plan, crew lead and sign-off.

Industrial and light manufacturing

Workshops, tools, light machinery and inventory. Heavy pieces that cannot go through the building are lifted by crane; specialised industrial rigging is planned with a specialist.

How we run a large project

1. Discovery

Site visits at every location, an inventory of what moves and what does not, the constraints — building hours, elevators, docks, security, deadlines — and a list of who decides what. We also identify risks early: a single freight elevator, a deadline that cannot move, equipment that needs a specialist.

2. The project plan

A written plan sets out the phases, the sequence, the crews and trucks for each phase, the schedule and the milestones. Every area and item is coded so it can be tracked from the old location to the new one. The plan comes with a written scope and quote — fixed, hourly or a mix, depending on the project — broken down by phase.

3. Communication

One project manager is your single point of contact. Before each phase, the teams affected receive instructions: what to pack, how to label, what to take home, where to go on the first morning. During each phase, the project manager reports progress to you.

4. Execution in phases

Each phase is moved, installed and checked before the next one begins. Between phases, items that cannot go straight to their new location are held in storage. The goal is simple: each part of your organization is out of service for as short a time as possible, and never all at once.

5. Close-out

At the end, a final walkthrough, removal of all crates and packing materials, a punch list of anything to adjust, and a short report of what was moved, where it went and any issues.

Keeping operations running

The best large moves are the ones nobody notices. We plan phases around your operations: evenings and weekends for offices, closure periods for schools, low-volume days for warehouses, and department-by-department moves for clinics. Critical functions — reception, servers, shipping, patient care — are moved first or last depending on what keeps them running.

Inventory and tracking

On a project with thousands of items, labelling is everything. Each item carries a code that shows its destination floor, room and position. Crates are numbered and listed. At the destination, crews place items by code rather than by asking. The inventory is also your record of what was moved.

Working with other trades

Large moves rarely involve only movers. We coordinate with electricians, IT providers, furniture installers, racking installers, security teams and building managers, and we share the schedule so each trade knows when its area is ready.

Pricing

Large projects are quoted after discovery and planning — fixed, hourly or a mix by phase, depending on the project — and broken down by phase so you can see where the cost is. The quote covers crews, trucks, materials, storage between phases and project management. If the scope changes — an extra floor, a new phase, a different sequence — the change is priced in writing before it happens.

Why plan with us

We are a moving company with our own crews and trucks, so the people in your plan are the people who show up. We do not subcontract phases to other companies, and the project manager who plans the project runs it. For smaller commercial moves, see office moving; for furniture-only work, see office furniture moving and installation.

What makes a project “large”

Size is not only the number of items. A move becomes a project when it cannot happen in one go: when the organization has to keep working during the move, when several buildings or floors are involved, when specialists must prepare equipment, or when the deadline is fixed and the window is short. Any one of these calls for a written plan, phases and a single person responsible for the whole.

A sample phasing plan

PhaseWhat movesWhen
0 — PreparationArchives, storage rooms, surplus furniture to storage or disposaltwo to three weeks before
1 — Support areasTraining rooms, secondary offices, stock not needed dailya weekday evening
2 — Main departmentsWorkstations, files, equipment, floor by floorone or two weekends
3 — Critical functionsServers, reception, shipping, specialized equipmentthe final weekend
4 — Close-outWalkthroughs, adjustments, removal of crates and debristhe following week

Every project has its own sequence; this is how a typical multi-floor office or institution is structured. Warehouses often reverse it: stock and racking contents move first, offices last.

Risks we plan for

Large moves go wrong in predictable ways. We plan for them from the start:

  • The building is not ready. Construction, cabling or inspections running late. We set a readiness check before each phase, with the space inspected before anything moves into it.
  • A single bottleneck. One freight elevator or one loading dock for hundreds of items. We schedule around it and add crews on the loading side rather than the elevator side.
  • Specialist equipment. Items that require the manufacturer’s technician to prepare or recalibrate them. Their availability sets the date for that part of the move.
  • Changing scope. New furniture arriving late, a department that is not ready. The plan includes a buffer, and changes are agreed in writing with their cost.
  • Communication. Staff who do not know what to pack or where to go. Each phase has a short instruction sheet for the people it affects.

Multi-site consolidations

When two or three sites become one, the project also involves deciding what from each site is kept. We inventory each site, work with you to decide what moves to the new location, what goes to storage and what is disposed of, and then move each site as its own phase. The inventory becomes the record of where everything ended up.

Reporting

For organizations that need documentation — public institutions, healthcare, companies with asset registers — we provide inventories and completion reports for each phase, with signatures at handover.

Who is involved on our side

Every large project has a project manager who plans it and stays with it to the end, a crew lead for each phase who runs the work on site, and crews sized to each phase. For you, that means one person to call about the plan and one person on site who knows exactly what is being moved that day.

Example: a school moving over the summer

A school relocating to a new building is a typical large project. Teaching stops in late June and staff return in late August, so the move has a fixed window of a few weeks. Classrooms, the library, administration, the gym storage, laboratories and archives each become a phase. Teachers pack their classrooms before the end of the year using crates and labels coded to the new rooms. Over the summer, crews move one wing at a time, the library is moved shelf by shelf so books keep their order, and laboratory equipment is prepared by the school’s technicians before it moves. Furniture no longer needed goes to other schools, charities or recycling. By the time staff return, each classroom is set up and the crates are gone.

Budgeting a large move

The budget for a large move depends on the number of items, the number of phases, the access at both sites and the time available. A generous time window almost always costs less than a compressed one: fewer crews working longer is cheaper than many crews in one weekend. The earlier we are involved, the more options there are to lower the cost — for example, moving archives and storage areas on weekdays before the main move, or disposing of surplus furniture before it is moved.

After the move

Large moves leave a tail of small tasks: an extra shelf in one office, a desk swapped between two people, crates to collect, the old site to be emptied for the landlord. We schedule a follow-up visit to handle these, so the project closes properly rather than fading out.

Scope

What the quote covers

Included

  • A dedicated project manager and a named crew lead per phase
  • Written project plan with phases and milestones
  • Inventory and labelling system for every item
  • Coordination with building managers, IT and trades
  • Storage for items between phases
  • Close-out report

Not included

  • Specialised industrial rigging — planned with a specialist when needed
  • Electrical, plumbing and IT work
  • Permits that only the owner or tenant can obtain
How it works

From first call to last box

1

Discovery

Site visits, inventory, constraints, deadlines and who decides what.

2

Project plan

Phases, crews, trucks, schedule, a written scope and the pricing for each phase.

3

Execution in phases

Each phase moved, installed and signed off before the next.

4

Close-out

Final walkthrough, removal of materials, report and handover.

Floor protection goes down before anything comes out

Runners on the stairs, blankets on the banister, corner guards at every turn — all in place before the first piece of furniture moves.

Reviews

What customers wrote on Google

★★★★★
Simplex Moving provided an exceptional service for my recent move. From the initial quote to the final delivery, everything was handled professionally and efficiently. The team was punctual, friendly, and careful with my belongings. I highly recommend Simplex Moving for anyone in need of a reliable moving company.
Vio Botan Verified Google review
★★★★★
We had an exceptional experience with this company—prompt, professional, and caring. Thank you all so much
kay beauty Verified Google review
★★★★★
I really liked how respectful and nice these guys were to me. Yes we did have some small issues and they were easily resolved!
Rozakhun Nazhmiyev Verified Google review
5.0 ★★★★★
90 reviews on Google
Read more reviews
Where we work

Large-Scale Moving Projects across Greater Montreal

Our crews work the island of Montreal, Laval and both shores every week.

FAQ

Questions about this service

Book this service

Tell us what is moving and where. We come back with one price, in writing, before anything is booked.

  • A reply within the hour, usually within fifteen minutes
  • No deposit until you accept the price
  • We tell you honestly when we are booked out

We reply within the hour — usually 15 minutes

Start your quote

Step 1 of 3 — no phone call needed to see a range.

    Where are you moving?

    What and when?

    Where do we send the quote?

    No obligation. We never sell your data.

    We reply within the hour — usually 15 minutes

    Get your free quote

    Leave your number and we will call you back with a price.

      We reply within the hour. No obligation, and we never sell your data.

      Call now WhatsApp Free quote