Moving a business is moving its routine
An office move is about desks and computers. A business or an institution moves something harder: the routine of the people who work there and the people who depend on it. A clinic has patients booked for Monday. A store has stock that has to be on the shelves before the doors open. A school has a first day that will not move. A non-profit has volunteers, files and donors. The furniture is the easy part; the plan around it is the job.
We move businesses and institutions across Montreal and beyond with our own crews and trucks, on a written plan and a written price agreed after a site visit. The schedule is built around your opening hours, not ours, and the move can be done in the evening or on a weekend so you lose as few working days as possible. For a standard office, see office moving.
Who we move
| Type | What usually moves | What matters most |
|---|---|---|
| Retail stores | Fixtures, shelving, counters, stock, back-room storage | Closing hours, stock labelled by section, fixtures reinstalled |
| Medical and dental clinics | Waiting rooms, offices, files, furniture, light equipment | Patient files sealed, specialised equipment handled by its technicians |
| Schools and daycares | Classroom furniture, libraries, offices, storage | Summer or holiday timing, room-by-room labelling |
| Non-profits and community organisations | Offices, archives, meeting rooms, donated furniture | Tight budgets, volunteer schedules, careful archives |
| Restaurants and cafés | Dining furniture, small equipment, dry storage | Coordination with the equipment technician and the landlord |
| Warehouses and workshops | Stock, racking, tools, packing stations | Phased moves so shipping continues |
| Professional practices | Law, accounting and engineering offices, archives | Confidential files kept sealed, after-hours timing |
How we plan a business move
- A site visit at both addresses. We walk the rooms with you and note what moves, what stays, what is thrown away, and how we get in and out: loading docks, service elevators, building hours, parking.
- A written plan. Who packs what, in what order, on which days; how the new space is labelled; what has to be disconnected by your technicians before we arrive.
- One written price. For that plan — crew, trucks, materials, the number of evenings or weekend days — not an open-ended estimate.
- Labels matched to the new floor plan. Every box, workstation and piece of furniture gets a destination code that matches a sign on the door of the new room.
- The move. After closing or on a weekend, as planned: the crew protects both buildings, loads by room, and places everything at the new address according to the plan.
- Set-up. Furniture reassembled, boxes in the right rooms, packaging removed, so your team can unpack and start working.
Retail stores
A store move is measured in selling days. The goal is to close on Saturday evening and open at the new address with the shelves full. We take fixtures and shelving apart and label each piece to its section; stock is packed by department in the order it will be shelved; cash counters and displays are wrapped and moved last and placed first. If the new store needs work before fixtures go in, we can keep stock in storage for a few days and deliver it when the space is ready.
Clinics and health-care offices
Clinics move furniture, files and equipment — and only the first two are simple. Patient files are packed in sealed, numbered boxes that stay in your custody: the crew moves them, but does not open them. Waiting rooms, consultation rooms and offices are labelled room by room. Specialised equipment — dental chairs, imaging, laboratory instruments, sterilisers — usually needs the manufacturer or your service provider to disconnect it, and often to recalibrate or recertify it after the move. We coordinate with them so they disconnect before we arrive and reconnect after we place the equipment.
Schools and daycares
School moves happen when the building is empty of students: in the summer, during a holiday break, or over a long weekend. Classroom furniture, libraries and staff rooms are moved room by room, with the new room number on every label. Small furniture for children is wrapped and stacked carefully; library books travel in small boxes, in shelf order, so they can go back on the shelves the way they came off.
Non-profits and community organisations
Community organisations move on tight budgets and tight schedules, often with volunteers who want to help. We plan the move so your team packs what it knows best — files, supplies, program materials — and our crew takes care of the heavy furniture, the truck and the building protection. Archives are packed in labelled boxes in the order you want to find them.
Restaurants and cafés
Restaurant moves depend on what is built in. Dining-room furniture, small equipment, dry storage and office contents move like any business. Commercial refrigeration, ranges, hoods and anything connected to gas, water or a drain must be disconnected and reconnected by the equipment technician and, often, the landlord’s contractor. We coordinate with them and move the equipment once it is free.
Warehouses and workshops
A warehouse cannot stop shipping for a week. We plan warehouse moves in phases: slow-moving stock first, racking taken down and reinstalled section by section, the packing stations moved last over a weekend. Stock is labelled by location code so it goes straight into the new layout. Heavy machinery that needs rigging or a crane is quoted separately, and our crane service is available for pieces that cannot go through a door.
Evening and weekend moves
Our crews work seven days a week, from 7 a.m. to 9 p.m. Business moves can be scheduled in the evening after closing or on a weekend, and there is no weekend premium on our rates. For larger sites, a Friday evening and a full Saturday usually cover a move that would otherwise close the business for two working days. See after-hours and weekend moving.
Buildings, docks and insurance
Commercial buildings have rules: loading-dock bookings, service-elevator reservations, hours when moving is allowed, floor and wall protection requirements. We ask for the building’s moving rules during the site visit, follow them on the day, and send the certificate of insurance building management requires before we are allowed in.
What stays with your team
- IT networks, servers and phone systems. Your IT provider disconnects and reconnects them; we pack, move and place computers, monitors and printers.
- Regulated items. Chemicals, controlled substances, regulated waste and anything that requires a permit to transport stay with the organisation responsible for them.
- Confidential documents. Files are packed in sealed boxes, moved and placed by the crew, and opened only by your staff.
Moving out of Montreal
Businesses and institutions move across Quebec, to other provinces and to the United States as well. Long-distance commercial moves are quoted at one fixed price after the site visit; see long-distance moving and corporate relocation for moving staff with the business.
Moving within the same building
Not every business move crosses town. Some are only a few floors up or down — a clinic taking a larger suite, an office consolidating two floors, a school reorganising its wings. These moves are planned like any other: labels matched to the new rooms, workstations taken apart and rebuilt, the service elevator booked for the hours we need. Without a truck between the two addresses, they often fit into a single evening.
Public bodies and institutions
Schools, municipalities, health-care organisations and other public bodies usually buy services through a procurement process. We provide what it asks for: a written scope after the site visit, a written price, a certificate of insurance, and an invoice in the form the purchasing department needs. Tell us at the first contact what the process requires — quotes from several movers, a purchase order, a specific format — and we prepare our documents accordingly.
Working with landlords and contractors
A business move rarely happens in an empty building. The landlord has rules about docks, elevators and hours; contractors may still be finishing the new space; cleaners, IT installers and furniture suppliers may need the same elevator. We plan around them:
- One schedule shared with the landlord, the contractors and your team.
- Deliveries timed so the furniture does not arrive before the floors are finished.
- Elevator and dock bookings coordinated so two trades are not waiting for the same slot.
- Protection installed before the first load and removed after the last.
What downtime costs
The real cost of a business move is often not the mover’s invoice but the days the business cannot operate. A store closed for three days loses three days of sales; a clinic that cancels a week of appointments loses a week of revenue and reschedules dozens of patients. That is why we plan around your opening hours — evenings, weekends, phases — and why the plan matters more than the hourly rate.
Equipment that needs more than a dolly
Some businesses own pieces that do not move like furniture: safes and vault cabinets, heavy printers and plotters, display cases with glass, gym equipment, shelving loaded with stock. Each is planned on its own — the route through the building, the protection, the number of movers and, for the heaviest, the right equipment. Very heavy or oversized items are covered by our safe and heavy item service, and anything that cannot go through a door may need our crane service.
After the move
The day after a business move is when small problems surface: a missing box, a desk in the wrong room, a shelf that wobbles. We plan for it. Your contact person gets a direct line to the crew lead for the days after the move, and anything that went to the wrong room or needs adjusting is fixed on a short return visit.
Getting a price
Tell us about the business, the two addresses, the size of the space and the dates you are considering, through the form below or by phone. We book a site visit, and you receive a written plan and one written price.
A planning timeline
| When | What happens |
|---|---|
| Eight to twelve weeks before | Choose the date, book the site visit, notify staff and key clients |
| Six weeks before | Written plan and price; floor plan of the new space with room numbers |
| Four weeks before | Book the loading docks and elevators at both buildings; confirm IT and equipment technicians |
| Two weeks before | Packing materials delivered; teams start packing archives and rarely used items |
| One week before | Labels on furniture and equipment; final walkthrough of the new space |
| Moving day | Disconnection by technicians, loading, delivery, placement, reassembly |
| The day after | Reconnection, unpacking, removal of packaging, punch list |
Smaller businesses compress this into three or four weeks; large institutions often need more. The site visit is where we agree on the right timeline.
The labelling system
Labels are what make a business move fast at the other end. Each room in the new space gets a code — a number and a colour — on a sign at its door. Every box, workstation and piece of furniture gets the same code before it leaves. At delivery, the crew does not need to ask where anything goes: they match the label to the door. Workstations also carry the employee’s name, so each person finds their own desk, chair and boxes on the first morning.
Archives and records
Many organisations move more paper than they think. Archives are packed in standard file boxes, numbered in shelf order, and listed on an inventory that stays with your records manager. Boxes are sealed and opened only by your staff. If some records do not need to move to the new space, they can go into storage and be delivered when needed.
A checklist for the person in charge
- Name one contact person with authority to decide on moving day.
- Get the building rules of both sites in writing: hours, docks, elevators, protection, insurance.
- Book IT, phone and equipment technicians for disconnection and reconnection.
- Decide what is not moving: old furniture, broken equipment, obsolete files.
- Share the floor plan of the new space with room codes before packing starts.
- Tell staff what to pack, how to label, and when their desk must be ready.
- Plan the first morning: keys, access cards, parking, coffee.
Furniture that stays, goes or changes
A move is a good moment to rethink the furniture. Some pieces will not fit the new space; some will be replaced; some will be reconfigured. We take apart and reinstall workstations, shelving and tables, and we can remove old furniture you are not taking — see office furniture services and junk removal and cleanouts.
Leaving the old space right
Leases often require the old space to be returned empty and clean. Plan for it: what has to be removed, what can stay, which fixtures belong to the landlord. We empty the space completely after the move and leave it swept, so your team can hand the keys back on time.
Large and multi-site projects
When a project covers several floors, several buildings or several weeks, it becomes a large-scale moving project with its own schedule and phases. The principles stay the same: a site visit, a written plan, one price per phase, and the same crews from start to finish.
Insurance and liability
Commercial buildings and institutions usually ask two questions before a move: is the mover insured, and what is covered. We send our certificate of insurance to building management on request, and the cargo in our truck is insured for the move. Valuable or sensitive equipment should be listed with its value before the move.